Wednesday, July 22, 2015

Kitchen Update #9

July 22, 2015 - The flooring was completed last week. Pergo had a recall on the flooring that we picked out so we had to change plans and pick from what Lowe's had in stock (in order to meet our cabinet install dates). Lowe's did give us a great deal on the new floor and we were able to have it put in the hallway too! It turned out really great.

Upstairs Hallway




















Finished Flooring



















The cabinets were delivered on July 21 and will be installed on the Wednesday.

Wednesday, July 15, 2015

Kitchen Update #8

Painting was finished on 7/10 by Shawn's Painting and Home Improvement. Here's how it looks...







Friday, July 10, 2015

Downtown Salt Lake

I was on the root of our office building Wednesday checking on the AC system,
it was a great day. Took a quick picture.  

Wednesday, July 8, 2015

Kitchen Update #7

Drywall, mud and sanding is done. Painting will start on Friday and the new flooring should be installed next week. I think we will be ready for the cabinets on 7/22.




Friday, July 3, 2015

Kitchen Update #6

Feels like we are on the home stretch now that the drywall is up. Hopefully it will be ready for painting next weekend.
South Wall

West Wall

North Wall (the refrigerator goes here)


Kitchen Update #5

Ready for drywall today! The South Wall where the sink will go. The plumbing is fixed. No more goofy uncapped drains.
















West Wall without Insulation...















West Wall with Insulation.















We added the insulation for a sound blocking between the bathroom and the kitchen.
















Nerds!




Wednesday, July 1, 2015

Kitchen Update #4

Can lighting is installed. We are trying out three different LED lights. We are going with the Sylvania LED light, its the one near the corner of the room. All of the yellow romex wiring is new, more power outlets for the countertop work area and the wiring is ready for the under cabinet LED light strips.

Today's nightmare, plumbing. The lower drain was cracked so I'm going to remove all of the items in the green box and just have a single drain.

Kitchen Update #3

Removed most of the drywall to prep for complete redo of the electrical wiring. Adding USB outlets, GFI protection, Dishwasher outlet and ISE outlet, under cabinet lighting, Can Lighting in the ceiling! Lighting was always a problem in the kitchen but not any longer!

New drywall should be installed on 7/3/15.

New Subfloor is ready thanks to my big brother Mike Nikolaisen! We completed this in a few hours on 6/25/15. All new 3/8 plywood subfloor. It's solid, no creaking floor noise like we had. :)

The new Pergo floor should be installed on the week of 7/13.