Start date for the kitchen remodel was June 1, 2015. We moved in to our house almost ten years ago. At that time we said we would update the kitchen soon. Soon turned out to be almost ten years. So our kitchen remodel is off and running. I'll post updates as we move along.

















Thanks to Taz and Emily we made short work of removing the cabinets and old floors (both tile and linoleum). I'm thinking the subflooring will need to be replaced too. Suzanne and I have picked out the flooring, paint color and cabinets. We put a deposit on the cabinets today! Cabinet install date is scheduled for July 7th if we are ready.

Friday, March 14, 2014

Wednesday, July 24, 2013

The Pixel Painter

Hal Lasko, better known as Grandpa, worked as a graphic artist back when everything was done by hand. His family introduced him to the computer and Microsoft Paint long after he retired. Watch the video here; http://vimeo.com/70748579.

Thursday, July 11, 2013

Jeep Update 7/10/2013

I had the state safety and emissions check done last week.  Failed on both tests, the lower ball joint on the left side needed to be replaced and the emissions at a 2500 RPM were too high. 

Monday I took the Jeep to The Little Garage and they replaced the ball joints and tuned up the carburetor.
  The Jeep passed both the safety and emissions tests.  A quick trip to the DMV this morning and I got the stickers for the license plate and my new vehicle registration.

Here’s a picture with the “HAVOC” license plates that I had on my first vehicle in 1987.